Fitout Intel
Early commercial-opening intelligence from public records
Now covering: Florida on-premise beverage

Know which accounts to pursue, when to pursue them, and why the timing matters.

Fitout Intel identifies early commercial-opening signals from public records — building permits, liquor-license applications, and related filings — so sales teams can pursue accounts while buying decisions may still be underway.

We're starting with Florida beverage-distributor intelligence. The same public-record signal exists anywhere businesses build out physical locations.

What you get

Not a list of openings. A weekly briefing built for territory sales — each lead ships with the fields a rep needs to act.

Which accounts

Project address, concept type, legal entity and operator, ownership where available — from public records.

When to pursue

Liquor-license stage, buildout/permit stage, opening stage, and estimated sales timing for every lead.

Why timing matters

Recommended pursuit timing — engage now, engage soon, or monitor — with confidence stated on every lead.

82–491
days from permit signal to first public announcement, measured across four Miami validation cases
6
tracked opportunities in the Miami-Dade sample — 3 flagged ENGAGE NOW or ENGAGE SOON, plus 3 MONITOR
4
sample projects where our validation search found no public announcement

What we don't claim: we don't beat press on every project, we don't guarantee advance notice or decision-maker identification, and we separate what public records prove from what we infer, flagging what we don't know. The advantage is strongest with lower-profile and stealth projects.

Sample: current opportunities

Miami-Dade County, September 2026. Six tracked projects: 3 flagged ENGAGE NOW or ENGAGE SOON, plus 3 MONITOR leads — projects verified from permits where we're still confirming operator details, or where the brand is announced but not yet open. Sourced from county and municipal building-permit records and Florida DBPR pending license applications — all public records.

ENGAGE NOWIntenso — 640 Lincoln Rd, Miami Beach

Permit filed June 25, 2026 (2,139 sq ft, 69 seats, $127,800 buildout) · first announced September 15 — 82 days later · expected November 2026 · director Salvatore Viscomi · first U.S. location of a southern Italian brand. Press reports the final venue at ~120+ seats across indoor and patio plus a mezzanine (permit scope: 69 seats).

ENGAGE NOW109 Burger Joint (2nd location) — 11995 SW 26 St, Miami

Pending DBPR liquor-license application · our search found no announcement connecting the brand to this address · named operators Jose and Luis Blanco (established local brand).

ENGAGE SOONThe Daily Creative Food Co — MiamiCentral food hall, Miami

Pending DBPR license · applicant Adam Meltzer · new outpost inside an operating food hall — a placement our validation search did not find in press coverage.

MONITOR3 additional buildouts tracked

Ex-Melting Pot reopening, Kendall ($225k remodel) · NIKU X by Chubby Cattle flagship, Washington Ave (permit $1.7M; brand publicly announced July 2025, still pre-opening) · ex-MOD Pizza Kendall ($189k reno). Projects verified from permits; operators being identified before any field visit is recommended.

Proof of early detection

Historical cases showing how far in advance the public-record signal existed before any public announcement. Included as evidence of detection range — not as leads.

Cajun Boil — 1688 Meridian Ave, Miami Beach

491 days

Permit filed February 5, 2025 ($350,000 buildout) · first announced ~June 11, 2026 — roughly 16 months later.

Cactus Club Café — 850 Commerce St, Miami Beach

~149 days

Permit filed January 15, 2025 · first announced June 13, 2025 (Commercial Observer) — about 5 months later. Note: the city's Design Review Board application DRB25-1096 (public filing, plans dated May 2, 2025) predated the press piece.

Ezio's — 580 72nd St, Miami Beach

~121 days

Permit filed April 1, 2025 ($323,300 buildout) · first announced July 31, 2025 (RESIDENT Magazine) — about 4 months later; opened December 19, 2025.

Intenso — 640 Lincoln Rd, Miami Beach

82 days

Permit filed June 25, 2026 · first announced ~September 15, 2026 — also listed above as a current opportunity.

Methodology: county and municipal building-permit records plus Florida DBPR pending license applications, accessed without login. Press used only to establish announcement dates, never for discovery. ~1 in 16 permits in validation was later abandoned; existing-venue renovations are excluded from new-opening counts. Permit dates and valuations are per portal records accessed September 2026; city and DBPR permit details are not independently verifiable via public web search.

Founding Territory Partner

Early release — one metro per subscription, starting with Miami-Dade.

$199/month per territory
  • Weekly Monday briefing: every new qualifying signal in your territory
  • Full sample report on signup, so you can verify quality before week one
  • Operator-enrichment follow-ups on developing leads
  • Month-to-month, cancel anytime
  • Founding rate locked for 12 months
  • First 60 days run as a concierge pilot

Interested? hello@fitoutintel.com